April 1, 2025
A Pacific Cooperative has requested Utilicast perform a Current State and Gap Analysis for their Energy Operation Planning and Training Department. #MarketIntegration
A Pacific Cooperative has requested Utilicast perform a Current State and Gap Analysis for their Energy Operation Planning and Training Department. #MarketIntegration
An Eastern Independent System Operator is pursuing a vision for Operations of the Future in support of their overall Reliability Imperative, which is a broad effort to improve the operator’s capabilities to meet the changing grid and the anticipated challenges in managing and maintaining reliability. Utilicast will support several system transformations to enable necessary future […]
Utilicast was selected by a Pacific cooperative to provide an ongoing framework for changing activity and the development of effective architecture, design, and implementation roadmaps realizing capability increments. #SolutionArchitecture
Utilicast will provide NERC Operations and Planning compliance support services consisting of O&P RSAW Reviews for several standards, controls program risk assessment, evidence monitoring, controls testing, enforceable standards support for standards coming into effect in 2025, IBR registrations, and other compliance support as needed. #NERCAndFERCCompliance
Utilicast was selected to provide implementation services to replace the eDNA Historian and establish the PI System for a Central cooperative’s control centers. In addition to technical consulting, Utilicast will also provide project management and training. #GridAndPowerAnalytics
Utilicast will provide audit preparation support for an Eastern Cooperative for the 2025 Reliability First NERC audit. #NERCAndFERCCompliance
Utilicast will perform a Cyber Asset Inventory for a Central municipality. #NERCAndFERCCompliance
Utilicast was selected to support the preliminary ADMS upgrade conversations representing a Central municipality’s PI group. Utilicast will participate in conversations to ensure a robust design is developed in a way to minimize impacts to current PI design and processes. Utilicast will review tag names, current AF models, tag attributes and other applications consuming PI […]
Utilicast will assist a Central municipality inventory existing internal controls and build an internal control program with periodic testing for their NERC Transmission registrations. #NERCAndFERCCompliance
Utilicast will develop a nonintrusive, passive NERC CIP Cyber Network Discovery scan for a Central municipality’s power plants. #NERCAndFERCCompliance